High-Capacity Coconut Processing Line for PT Sasa Inti, Indonesia

Complete Desiccated Coconut Processing Line + 12 Module Combination Dryer | Coconut Processing Industry | PT Sasa Inti – Rodamas Group | Indonesia

Gem Drytech delivered a complete high-capacity Desiccated Coconut Processing Line for PT Sasa Inti – Rodamas Group, Indonesia, engineered for approximately 260,000 coconuts per day (~11,800 nuts/hour). The project covered the complete process from raw coconut handling through washing, cutting, drying, cooling, grading, packing, and dispatch, with an overall scope value of approximately USD 1.28 million.

Technical Snapshot

Client PT Sasa Inti – Rodamas Group, Indonesia
Project Year 2021
Solution Supplied Complete Coconut Processing Line + 12 Module Combination Dryer
Model 12 Module Combination Dryer
Product Tested Desiccated Coconut
Product Input 260,000 nuts/day (~11,800 nuts/hr)
Product Recovery
Final Moisture
Scope Engineering, supply, installation support, commissioning & process integration
Operation Continuous high-capacity coconut processing and drying

 

Problem

  • PT Sasa Inti required a fully integrated coconut-processing line capable of handling very high daily production volumes.
  • The plant needed continuous product flow from raw coconut receiving through final packing.
  • Hygienic food-grade processing and SS304 construction were important for product-contact areas.
  • The drying section needed controlled temperature, airflow, and residence time for consistent product processing.
  • The complete system needed to reduce manual handling while supporting high-throughput industrial production.

Proposed Solution

  • Gem Drytech engineered and supplied a complete turnkey coconut-processing solution for Desiccated Coconut production.
  • The front-end system included double-deck conveyors, nut counters, distribution systems, and more than 40 deshelling machines rated at 300 nuts/hr each.
  • The wet-processing section incorporated a bubble washer, coconut-water recovery system, stainless-steel tanks, filtration, and heat-exchanger integration.
  • White-meat slicers rated at up to 5 TPH and transfer conveyors were incorporated for controlled product preparation.
  • The core drying system consisted of a 12 Module Combination Dryer with radiator and controlled hot-air circulation.
  • Post-drying equipment included cooling, conveying, grading, magnetic separation, inspection, weighing, packing, sealing, and dispatch systems.

Result

  • The plant was engineered for approximately 260,000 coconuts per day.
  • The integrated process reduced dependence on manual material movement between production stages.
  • The drying system provided controlled operating conditions with adjustable airflow and residence time.
  • The complete line supported continuous product movement from raw coconut through finished packing.
  • The installation provided PT Sasa Inti with an industrial-scale platform for high-capacity Desiccated Coconut production.
  • The project demonstrated successful integration of multiple processing and drying technologies within one production line.

Conclusion

  • The PT Sasa Inti project demonstrates Gem Drytech’s capability to engineer and execute large-scale coconut-processing projects requiring multiple integrated process stages.
  • With a design capacity of approximately 260,000 nuts per day, the project highlights Gem Drytech’s ability to handle high-volume industrial coconut applications.
  • The combination of material handling, wet processing, cutting, controlled drying, cooling, grading, and packing created a complete end-to-end processing solution.

Applicability

  • High-capacity Desiccated Coconut processing
  • Integrated coconut-processing plants
  • Industrial coconut lines requiring 24/7 or continuous production
  • Projects requiring controlled multi-stage drying and product handling
  • Export-oriented coconut-processing facilities
  • Plants requiring automated or semi-automated processing from receiving to packing

Execution Timeline

  • Project Year: 2021
  • Fabrication: Approximately 16–20 weeks
  • Delivery: Approximately 4–6 weeks
  • Installation: Approximately 6–8 weeks
  • Commissioning: Approximately 2 weeks
  • Final Stage: Integrated plant commissioning and transition to production.

Project Validation

  • The project scope covered the complete coconut-processing line together with the drying and finishing sections.
  • The system was engineered for approximately 260,000 coconuts per day.
  • The 12 Module Combination Dryer formed the core thermal-processing section of the line.
  • Food-contact areas were designed with SS304 construction.
  • The project demonstrates Gem Drytech’s international capability in delivering integrated, high-capacity coconut-processing systems.

Our Gallery