Reliable, High-Performance Coconut Processing for Mayora Group, Indonesia

Complete Desiccated Coconut Processing Line | Coconut Processing Industry | PT Tirta Fresindo Jaya – Mayora Group | Indonesia

Gem Drytech designed, supplied, installed, and commissioned a complete end-to-end Desiccated Coconut Processing Line for PT Tirta Fresindo Jaya, Mayora Group, Indonesia, designed to process more than 120,000 coconuts per day. The integrated line has reportedly delivered 6+ years of continuous operation, very low maintenance requirements, and consistent product quality under industrial production conditions.

Technical Snapshot

Client PT Tirta Fresindo Jaya – Mayora Group, Indonesia
Project Year 2019–2020
Solution Supplied Complete Desiccated Coconut Processing Line
Model Integrated End-to-End Processing Line
Product Tested Desiccated Coconut
Product Input 120,000+ coconuts/day
Product Recovery
Final Moisture
Scope Engineering, supply, installation, commissioning, training & handover
Operation Continuous industrial desiccated coconut processing

 

Problem

  • Mayora required a fully integrated processing solution for large-scale Desiccated Coconut production.
  • The plant required processing capacity exceeding 120,000 coconuts per day.
  • The complete process needed to operate continuously from raw coconut intake through drying and final packing.
  • Low maintenance requirements and long-term operational reliability were key project expectations.
  • The system also needed to maintain consistent product quality during high-volume commercial operation.

Proposed Solution

  • Gem Drytech designed and supplied a complete end-to-end Desiccated Coconut Processing Line.
  • The system integrated raw coconut receiving, unloading, drilling, water extraction, deshelling, blanching, drying, conveying, finishing, and packing operations.
  • A multi-stage drying system was incorporated for controlled and consistent product drying.
  • The complete line was engineered as an interconnected production system rather than a collection of standalone machines.
  • Gem Drytech also supported on-site installation, commissioning, operator training, and final system handover.

Result

  • The complete coconut processing line was installed and accepted by the client.
  • The plant has reportedly operated continuously for more than six years.
  • Operational performance has remained stable with minimal reported downtime.
  • Spare-parts consumption has reportedly remained below 0.5% over six years of operation.
  • Low maintenance requirements have contributed to a reduced lifecycle operating cost.
  • The system has supported consistent Desiccated Coconut production at industrial scale.

Conclusion

  • The Mayora project demonstrates Gem Drytech’s capability to execute complex, high-capacity coconut-processing projects in international markets.
  • The project combines complete process engineering, multi-stage drying, material handling, finishing, and packing into one integrated production system.
  • Long-term operation and low reported spare consumption demonstrate the importance of designing for lifecycle reliability, not only initial commissioning performance.

Applicability

  • Desiccated Coconut processing
  • High-capacity coconut-processing plants
  • Integrated raw coconut-to-packed-product production lines
  • Plants requiring multi-stage drying and continuous material handling
  • Food processors focused on low lifecycle maintenance and stable commercial operation

Execution Timeline

  • Project Phase: Complete system engineering and equipment supply.
  • Installation Phase: Full mechanical and process-line integration.
  • Commissioning: System commissioning and operational trials completed.
  • Handover: Operator training and transition to commercial production.
  • Long-Term Operation: More than 6 years of reported continuous service.

Project Validation

  • The complete production line was installed and accepted by the client.
  • All major processing sections—including unloading, drilling, deshelling, drying, conveying, and finishing—were integrated into the project.
  • The system successfully transitioned from installation and commissioning to commercial operation.
  • Long-term operation and low reported spare usage provide strong evidence of equipment reliability and lifecycle performance.